The mud is too dry or too much, and there are hard objects stuck in the brick machine, which increases the load on the clutch of the brick machine and causes the clutch disc to be worn or smashed. This causes the clutch disc to break down from time to time. Therefore, in the production process, we must master the dry humidity of the mud.
There should be no grease, sludge, etc. on the clutch plate. When assembling the clutch plate, be sure to check and remove these debris, otherwise it will cause the clutch to slip and affect the work efficiency.
Using calendering glue process. Brief description of the process flow: Impregnate the non-asbestos fiber strands in resin, and then in the glue. After drying, the non-asbestos fiber wire is calendered and glued, passed through strip making, wound, and then hot-pressed for further heat treatment. Then through grinding, dust removal and printing. Final inspection of the packaging.
The process of impregnation drying tower is adopted. Brief description of the process flow: First, the non-asbestos fiber threads are dipped in resin and glue and dried. Then, it is wound, hot-pressed, and further heat-treated. Then through grinding, dust removal and printing. Final inspection of the packaging.