Menu
@mrjackson

DTP04-2P-CE02 2 Position Black Short End Cap E-Seal Male Housing

Original Part Number: DTP04-2P-CE02

LHE Part Number: 102500211273BSEN

Number of Positions: 2

Contact Tab Size Series: C2.5

Size (MM): L:49.05 W:18.7 H:11.2

Seal or Unseal: Seal

Overview:

LHE PN: 102500211273BSEN
Certification: TUV, IATF16949, ISO14001, ISO9001, CQC, UL, ROHS
MOQ: Most product not have MOQ, Small order can be accepted.
Sample service: Free Samples
Delivery Time: 3-5 Days
Quality Control All goods will be 100% inspected before dispatched
Payment: T/T, Western Union, MoneyGram, PayPal; 30% deposits; 70% balance before delivery.
Shipment: DHL/FedEx/TNT/UPS/EMS/Aramex/SF for samples, By Air or by Sea for batch goods; Airport/ Port receiving.

Enquiry Form

    Interesting Products

    name

    Company

    Email(*)

    Tel/Mobile

    Address

    Tell us your needs (as specific as possible)


    Smelting process
    The temperature of furnaces used in the copper, nickel or lead industries is usually around 1300°C and is therefore not very suitable for melting ceramic based automotive exhaust catalysts. This furnace is heated with coke, gas, oil or oxygen-enriched air. Large smelters certainly do not have any problems with additional processing of this material. If its feed is less than 1% of the total plant feed, it will not have any impact on the smelting process.
    Therefore, on the one hand, the real advantage of processing precious metal-containing materials by well-known smelting methods in such a large furnace is the low cost of smelting and processing feedstock, but on the other hand, there is an inability to recover precious metals with effective recovery rates and high yields. Especially Rhodium. Excessive dilution of platinum group metals and excessive slagging. This situation suggests that subsequent enrichment processes such as PGM recovery and refining will require higher costs. Obtaining pure metal is a long and arduous process. Therefore, this law has been abandoned by many manufacturers.