MG620411 20 Position Male Electronic Equipments

Original Part Number: MG620411

LHE Part Number: 118002020336

Number of Positions: 20

Contact Tab Size Series: 1.8

Size (MM): L:34 W:45 H:16.5

Seal or Unseal: Unseal

Overview:

LHE PN: 118002020336
Certification: TUV, IATF16949, ISO14001, ISO9001, CQC, UL, ROHS
MOQ: Most product not have MOQ, Small order can be accepted.
Sample service: Free Samples
Delivery Time: 3-5 Days
Quality Control All goods will be 100% inspected before dispatched
Payment: T/T, Western Union, MoneyGram, PayPal; 30% deposits; 70% balance before delivery.
Shipment: DHL/FedEx/TNT/UPS/EMS/Aramex/SF for samples, By Air or by Sea for batch goods; Airport/ Port receiving.

Enquiry Form


The inspection process is the last process of error prevention in wire harness manufacturing, and it is also the last process to ensure the quality of wire harness and product qualification. Including 100% electrical continuity inspection, staple inspection, relay, fuse performance inspection, full-scale appearance inspection, bolt torque verification inspection, etc. The error-proof design of the process documents of the inspection process is particularly important.
Design different inspection processes according to customer needs and project requirements, but 100% continuity inspection and 100% full-scale appearance inspection are inspection items that must be designed for each wire harness product. If necessary, design 200% full-scale appearance inspection or multi-frequency inspection Sampling inspection; design the image detection station of the fuse piece and relay in the fuse box, and secondly check the correctness of the installation of the accessories of the fuse box; design the performance detection station of the relay and the fuse piece, and check the reliability of the work of the relay and the fuse piece sex. It is not necessary for the design of relay and fuse performance testing station. The HMES system is used to scan the code and pass through the station for the conduction inspection, carding inspection, image inspection, relay performance inspection, and full-scale appearance inspection, pass the inspection, miss the inspection, and alarm the next process, which can completely avoid the occurrence of missed inspections.