Menu
@mrjackson

PP0300301 2 Position Male Harness Assemblies

Original Part Number: PP0300301

LHE Part Number: 163000220916

Number of Positions: 2

Contact Tab Size Series: 6.3

Size (MM): L:28.6 W:13.6 H:20

Seal or Unseal: Unseal

Overview:

LHE PN: 163000220916
Certification: TUV, IATF16949, ISO14001, ISO9001, CQC, UL, ROHS
MOQ: Most product not have MOQ, Small order can be accepted.
Sample service: Free Samples
Delivery Time: 3-5 Days
Quality Control All goods will be 100% inspected before dispatched
Payment: T/T, Western Union, MoneyGram, PayPal; 30% deposits; 70% balance before delivery.
Shipment: DHL/FedEx/TNT/UPS/EMS/Aramex/SF for samples, By Air or by Sea for batch goods; Airport/ Port receiving.

Enquiry Form

    Interesting Products

    name

    Company

    Email(*)

    Tel/Mobile

    Address

    Tell us your needs (as specific as possible)


    The development direction of the “four modernizations” of automobiles is the future development trend of the automobile industry, including autonomous driving, networking, electrification of power systems, and shared mobility. With the continuous improvement of intelligent driving technology for the intelligent level of the vehicle, the control capability of the vehicle is also greatly increased. This process promotes the gradual change of the electronic and electrical architecture of the vehicle from a distributed architecture to a centralized dedicated domain controller architecture. Carry out continuous evolution and development in order to provide a more high-speed, safe and reliable electronic architecture. In this process, not only is it required that the intelligent driving function can run on a dedicated central domain controller with high-performance software-to-hardware integration, but it is also required that the entire vehicle control also needs to run on a central and On the controller, such a central domain controller not only needs to serve as the terminal for the entire body control, but also needs to execute the comprehensive control system end including the central gateway, power, chassis and other domains. This is also the precondition for realizing subsequent service-oriented development.

      Interesting Products

      name

      Company

      Email(*)

      Tel/Mobile

      Address

      Tell us your needs (as specific as possible)